Hinze Dam Stage 3
The infrastructure component of this project included numerous small roads and bridges as well as an architect designed Visitor Centre and large scale tree clearing operations in remote locations.
![](https://kaymaksurvey.com.au/wp-content/uploads/2019/05/HinzeDamLaymak3.webp)
![](https://kaymaksurvey.com.au/wp-content/uploads/2019/05/HinzeDamLaymak2-800x600.jpg)
![](https://kaymaksurvey.com.au/wp-content/uploads/2019/05/HinzeDamLaymak4-800x535.jpg)
![](https://kaymaksurvey.com.au/wp-content/uploads/2019/05/HinzeDamLaymak1-800x600.jpg)
Category
Boundary Marking
Area
Hinze Dam
Value
$380 million
Date
May 2018
![](https://kaymaksurvey.com.au/wp-content/themes/kaymaksurvey/images/background-element.jpg)